As October’s Fire Prevention Month continues, building owners and contractors can carry that focus into upcoming maintenance and renovation projects. Spray-applied fire-resistive materials (SFRMs) insulate structural steel, slowing its temperature rise during a fire and helping maintain the fire-resistance performance of the protected assembly.
For New York building owners and contractors, including SFRMs in project planning provides opportunities to review existing fireproofing, coordinate repairs, and document completed work.
Planning for Building Changes
An office renovation may involve new ductwork, relocated piping, or additional equipment supports. When that work takes place near protected structural steel, including fireproofing in the project scope helps contractors plan access, protect existing material, and account for repairs.
Much of this fireproofing sits above ceilings, behind walls, or within mechanical spaces. Reviewing its condition while those areas are accessible allows project teams to address repair needs before finishes are installed.
Early coordination also gives owners, design professionals, and contractors time to establish who will evaluate the existing material, perform repairs, and arrange required inspections.
Reviewing Existing Conditions
An SFRM review considers the material’s coverage, condition, and attachment to the substrate. Areas near new attachments, equipment installations, or previous repairs deserve attention, along with locations affected by leaks or other moisture exposure.
Construction activity can scrape or dislodge fireproofing. Water exposure and corrosion of the underlying steel may also affect its condition or bond. Identifying the cause of material loss helps the project team address the underlying condition before completing repairs.
Existing drawings, fire-resistance designs, product information, and inspection records can help establish repair requirements. When those records are incomplete, the design professional and fireproofing contractor can determine what additional information is needed.
Coordinating Repairs
Repair methods depend on the existing fireproofing product, the applicable fire-resistance design, and the size and condition of the area being repaired. Contractors need to confirm that the repair material is suitable for the existing system and follow the manufacturer’s application instructions.
The repair scope should address:
- Material compatibility: Confirm that the repair product is approved for use with the existing fireproofing and applicable fire-resistance design.
- Repair extent: Check any limits on patch size and determine the appropriate method for larger areas.
- Surface preparation: Prepare exposed steel and surrounding material according to the manufacturer’s requirements, addressing moisture or corrosion as needed.
- Thickness and coverage: Restore the protection required by the applicable design, including specified thickness, density, and coverage.
- Inspection and testing: Identify the inspections and tests required by the project documents and applicable code.
Sequencing repairs with mechanical, electrical, and plumbing work helps protect completed areas. Project teams can schedule repairs after nearby work that could disturb the material and before ceilings or other finishes limit access.
Planning for Inspection
Inspection requirements belong in the renovation schedule from the start. Under NYC Building Code Section 1705.14.7, alterations in office spaces and spaces classified as Occupancy Group B require special inspection of existing required SFRMs when the work exposes the material on structural members or requires access to areas where it can be observed.
The design professional can identify which code provisions apply to the project and coordinate with the inspection team. Allowing time for review, repairs, and verification before closing accessible areas helps teams complete this work within the construction schedule.
Keeping Useful Records
After repairs are complete, owners can retain product information, repair locations, photographs, and inspection results with the building’s other fire protection records.
These records give future project teams a starting point when planning tenant improvements or equipment upgrades. Maintenance teams can also use them when coordinating work near protected steel or following up on a leak.
Including fireproofing in work orders and contractor coordination keeps it part of the building’s ongoing care.
Making Fireproofing Part of the Plan
Fire Prevention Month is a good time to include existing fireproofing in plans for the coming year. For owners and contractors across Greater New York, coordinating evaluations, repairs, and inspections with scheduled building work helps maintain required fire-resistance protection as buildings change.
To learn more about spray-applied fireproofing and industry best practices, visit plasterny.org.