5 Ways to Prepare for Local Law 97 Compliance in New York City: Why Insulation, Plastering, and Fireproofing Matter

Local Law 97 is now active in New York City. As of May 1, 2025, buildings over 25,000 square feet must meet new carbon emissions limits. The first report is due by June 30, with an option to extend to August 29 if a design professional is on board.

With stricter targets coming in 2030, building owners are moving fast on upgrades. Insulation is one of the most effective ways to cut energy use and should be addressed early.

Spray-applied fireproofing is still needed to meet code when the structure is exposed, and plastering helps restore interiors after energy upgrades. These trades are becoming more important as owners look to avoid fines and keep projects moving.

1. Insulation Supports Carbon Reduction Goals

Insulation plays a key role in improving energy efficiency and achieving the performance goals of LL97. High-performance materials, such as spray polyurethane foam (SPF), offer R-values of R-7 or higher per inch and provide strong air and vapor sealing, making them among the most effective options for reducing energy loss.

SPF is commonly paired with a 15-minute thermal barrier to meet code requirements. Options include intumescent coatings or cellulose-based products, such as URE-K, which also enhance acoustic and thermal protection.

Other spray-applied insulation materials, including Monoglass and cellulose-based products, are also widely used in retrofits. These can be applied as cavity-fill solutions to improve thermal performance in aging or inefficient wall and ceiling assemblies.

In addition to walls and ceilings, these systems are often used in parking garages to block cold air, on roofing systems to improve top-floor R-values, and on perimeter walls during multi-floor renovations.

2. Retrofits Often Open Up Walls and Ceilings

As building owners pursue upgrades to meet emissions goals, more projects are opening up walls and ceilings to replace mechanical, electrical, and plumbing (MEP) systems or improve the building envelope. This creates demand for plastering and sprayed fireproofing contractors, who are needed to restore interior finishes and reapply safety materials. Without early coordination, inspection delays and rework can disrupt timelines.

3. Spray-Applied Fireproofing Is a Safety Requirement, Not a Performance Driver

MEP upgrades often expose structural steel and fire-rated assemblies. If spray-applied fireproofing is removed or damaged during renovation, it must be reapplied to meet code and pass life safety inspections. This work should be considered during both the design and construction phases, especially in buildings that follow non-combustible construction codes, where sprayed-applied fireproofing is often required.

Spray-applied fireproofing systems are expected to meet specific thickness and adhesion standards, and proper installation relies on trained, qualified crews.

While spray-applied fireproofing plays an important safety role, it does not contribute to emissions reduction under Local Law 97.

4. Envelope Upgrades Call for Skilled Plastering

Improving building envelopes is a common strategy for reducing emissions to meet Local Law 97 targets, especially in older buildings. Upgrades like window replacements, insulation improvements, and air sealing often require opening interior walls.

In schools, offices, and residential buildings, this work must be done with care to minimize disruption. Skilled plastering crews restore finishes efficiently and cleanly, helping projects stay on schedule and maintaining interior quality.

Exterior Insulation and Finish Systems (EIFS) can also support LL97 compliance. This cladding system can be installed over existing surfaces such as block, concrete, metal panels, and brick. It can provide R-values ranging from R-4 to R-32, depending on the thickness of the insulation. EIFS is approved for use in New York City and can function as an air and vapor barrier, helping improve energy performance while improving exterior appearance.

5. Demand Will Keep Growing Through 2030

As the 2030 compliance deadline approaches, demand for retrofit work will continue to grow.  While all three trades support compliance, insulation is the only one that directly reduces emissions, making it a top priority in planning.

By incorporating SPF, Monoglass, cellulose spray, and cavity-fill systems early in the process, teams can lower heating and cooling loads, reduce coordination issues, and help building owners meet Local Law 97 targets.

To access the full text of Local Law 97 at the NYC Department of Buildings, click here.